LNG liquifaction plant
Add category
Northernmost LNG plant in the world.
Contractor: Aker Kvaerner
The whole LNG processing complex is called Snohvit LNG Export Terminal. Construction was started in 2003 and came on stream on August 2007. Processes gas from the Snohvit, Albatross and Askeladden gas fields via a 160 km pipeline. Annual production capacity is estimated at 5.75 billion cubic mtr LNG (or 4.3 million t/yr), 747,000 tons condensate, and 247,000 tons LPG. Total investment cost was NOK 34.2 billion for field development, pipeline, and land plant, and NOK5.4 billion for ships.
operator: StatoilHydro
partners: Petoro, Total, Gaz de France, Hess, RWE Dea, Svenska Petroleum Exploration
Contractor: Aker Kvaerner
The whole LNG processing complex is called Snohvit LNG Export Terminal. Construction was started in 2003 and came on stream on August 2007. Processes gas from the Snohvit, Albatross and Askeladden gas fields via a 160 km pipeline. Annual production capacity is estimated at 5.75 billion cubic mtr LNG (or 4.3 million t/yr), 747,000 tons condensate, and 247,000 tons LPG. Total investment cost was NOK 34.2 billion for field development, pipeline, and land plant, and NOK5.4 billion for ships.
operator: StatoilHydro
partners: Petoro, Total, Gaz de France, Hess, RWE Dea, Svenska Petroleum Exploration
Wikipedia article: http://en.wikipedia.org/wiki/Snøhvit
Nearby cities:
Coordinates: 70°41'13"N 23°35'55"E
- QatarGas 5290 km
- RasGas 5292 km
- Prigorodnoe 6111 km
- Nigeria LNG 7470 km
- Arun Natural Gas Liquefaction 8864 km
- Petronas LNG Complex 9652 km
- Tangguh LNG Plants (Train-1 & Train-2) 10981 km
- Peru LNG 11772 km
- Karatha Gas Plant 12291 km
- Pluto Gas Plant 12293 km
- Kvaløya 12 km
- Seiland 30 km
- Rolvsøy 36 km
- Ingøya 45 km
- Havøya 52 km
- Breisundet 54 km
- Hjelmsøya 59 km
- Måsøya 63 km
- Porsangerfjorden 80 km
- Magerøya 88 km