Tamor-Mewa Hydroelectric Project
Nepal /
Jhapa /
Mechinagar /
World
/ Nepal
/ Jhapa
/ Mechinagar
lake
Add category
Spark Hydroelectric Company Limited (SHCL) is developing the Tamor-Mewa Hydroelectric Project (TMHEP) in Taplejung district in eastern Nepal. The survey License to carry out a Feasibility study and Environmental Impact Assessment of the Project has been granted to SHCL by government authority.The proposed Tamor-Mewa Hydroelectric Project is located along the left bank of Mewa Khola and Tamor River. The project area lies in Taplejung Municipality, Meringden, Mikwakhola and Athrai- Tribeni Rural Municipalities of Taplejung District, Province 1 of Federal Democratic Republic of Nepal. The geographical boundary of project is between latitude of 27° 20' 00'' N and 27° 24' 08'' N and longitude of 87° 37' 15'' E and 87° 40' 00'' E.
Nearby cities:
Coordinates: 27°22'2"N 87°38'35"E
- Tingkye Tso 115 km
- Tsomo Dramling 131 km
- Dingmu Co 139 km
- Dochen Tso 188 km
- Kala Tso 193 km
- Xiabuqu Reservoir 194 km
- Lang Co 207 km
- Zhongba Yu Tso 218 km
- Ngamring Kyemtso 225 km
- Manla Reservoir 271 km
- santhakra vdc 5 km
- Change vdc 5.9 km
- Dhungesanghu vdc 7.1 km
- Kabeli-Tamor Dovan 10 km
- Sanghu vdc 11 km
- phakumba taplejung 13 km
- छातेढुङा गा बि स (Chhatedhunga VDC) 18 km
- Terhathum District 27 km
- Panchthar District 29 km
- Sankhuwasabha 38 km