Sweetwater 4a Wind Farm
USA /
Texas /
Sweetwater /
World
/ USA
/ Texas
/ Sweetwater
wind farm
Add category

Sweetwater 4a Wind Farm, part of phase 4 of the 'Sweetwater' wind farms, is located mostly about 5-9 miles northwest'ish of the village of Maryneal, which is about 15 miles south of Sweetwater, Texas. Commissioned in 2007, it consists of 135 Mitsubishi MWT-1000-61 wind turbines with a combined nominal capacity of 135 MW.
Wikipedia article: https://en.wikipedia.org/wiki/Sweetwater_Wind_Farm
Nearby cities:
Coordinates: 32°18'46"N 100°26'57"W
- Horse Hollow II Wind Energy Center 21 km
- Capricorn Ridge Wind Farm 64 km
- Broadview Wind Farm 379 km
- Flat Ridge 2 Wind Farm 597 km
- Limon III Wind Farm 840 km
- Limon I & II Wind Farms 849 km
- Cedar Point Wind Farm 859 km
- Peetz Table Wind Farm 1005 km
- Cedar Creek 1 Wind Farm 1017 km
- Altamont Pass Wind Farm 2029 km
- Electrical substation 3.9 km
- Wind turbine (Sweetwater 3 Wind Farm) 4.7 km
- Wind turbine (Sweetwater 3 Wind Farm) 5.2 km
- Electricity Sub-station 5.3 km
- Wind turbine (Sweetwater 3 Wind Farm) 5.6 km
- Football Stadium 6 km
- Electrical substation (Sweetwater 2 Wind Farm) 6.8 km
- Buzzi Unicem Maryneal 7 km
- Wind turbine (Sweetwater 1 & 2 Wind Farm) 8.7 km
- Gesin Ranches Airport (86XS) 12 km
Electrical substation
Wind turbine (Sweetwater 3 Wind Farm)
Wind turbine (Sweetwater 3 Wind Farm)
Electricity Sub-station
Wind turbine (Sweetwater 3 Wind Farm)
Football Stadium
Electrical substation (Sweetwater 2 Wind Farm)
Buzzi Unicem Maryneal
Wind turbine (Sweetwater 1 & 2 Wind Farm)
Gesin Ranches Airport (86XS)