Buffalo Gap 2 Wind Farm
USA /
Texas /
Trent /
World
/ USA
/ Texas
/ Trent
wind farm
Add category
Buffalo Gap 2 Wind Farm is located in the 'highlands' southeast of Sweetwater and southwest of Abilene, Texas. The three 'Buffalo Gap' wind farms are on the north side of that area and 'BG2' is the northwestern of the three, roughly straddling the north part of County Road 258. Commissioned in 2007, it consists of 155 GE Energy 1.5sle wind turbines with a combined nominal capacity of 232.5 MW.
Wikipedia article: https://en.wikipedia.org/wiki/Buffalo_Gap_Wind_Farm
Nearby cities:
Coordinates: 32°20'40"N 100°12'43"W
- Horse Hollow II Wind Energy Center 4.6 km
- Capricorn Ridge Wind Farm 86 km
- Broadview Wind Farm 391 km
- Flat Ridge 2 Wind Farm 587 km
- Limon III Wind Farm 844 km
- Limon I & II Wind Farms 854 km
- Cedar Point Wind Farm 863 km
- Peetz Table Wind Farm 1008 km
- Cedar Creek 1 Wind Farm 1021 km
- Altamont Pass Wind Farm 2048 km
- Wind turbine (Buffalo Gap 2 Wind Farm) 3.4 km
- Rafter P Airport (TA00) 7.6 km
- Nolan, Texas post office 8.4 km
- Wind turbine (Sweetwater 4a Wind Farm) 9 km
- Electrical substation (Horse Hollow III Wind Farm) 11 km
- Wind turbine (Horse Hollow III Wind Farm) 12 km
- Wind turbine (Horse Hollow III Wind Farm) 13 km
- Nolan Cemetery 13 km
- Wind turbine (Sweetwater 3 Wind Farm) 15 km
- Gesin Ranches Airport (86XS) 16 km
Wind turbine (Buffalo Gap 2 Wind Farm)
Rafter P Airport (TA00)
Nolan, Texas post office
Wind turbine (Sweetwater 4a Wind Farm)
Electrical substation (Horse Hollow III Wind Farm)
Wind turbine (Horse Hollow III Wind Farm)
Wind turbine (Horse Hollow III Wind Farm)
Nolan Cemetery
Wind turbine (Sweetwater 3 Wind Farm)
Gesin Ranches Airport (86XS)