Thumb Wind Park - Sigel
USA /
Michigan /
Port Hope /
World
/ USA
/ Michigan
/ Port Hope
wind farm, invisible
Thumb Wind Park - Sigel section - is located in Sigel and Bloomfield Townships, Huron County, Michigan, north of Route 142 about halfway between Bad Axe and Harbor Beach. Commissioned in 2012, it consists of 40 GE Energy 1.6MW wind turbines with a combined nominal capacity of 64 MW.
Nearby cities:
Coordinates: 43°51'53"N 82°48'4"W
- K2 Wind Farm 89 km
- Goshen Wind Farm 97 km
- Gratiot Wind Park 151 km
- South Kent Wind Farm 160 km
- Port Burwell Wind Farm 202 km
- Summerhaven Wind Energy Centre 241 km
- Grand Renewable Wind Farm 254 km
- Niagara Region Wind Farm 272 km
- Lee-DeKalb Wind Energy Center 551 km
- Mesgi’g Ugju’s’n Wind Farm 1326 km
- Bloomfield Township 4.4 km
- Sigel Township 5.9 km
- Rubicon Township 8.5 km
- Lincoln Township 12 km
- Verona Township 13 km
- Huron Township 14 km
- Paris Township 15 km
- Sherman Township 18 km
- Dwight Township 18 km
- Bingham Township 19 km