MEG Energy - Christina Lake Regional Project

Canada / Alberta / Grand Centre /
 oil sands mine/extraction  Add category
 Upload a photo

MEG Energy Corp currently produces about 25,000 barrels of bitumen per day from the Athabasca Oil Sands using the Steam Assisted Gravity Drainage (SAGD) process. Ultimate capacity after Phase 3 is completed is expected to be 210,000 barrels per day.

www.megenergy.com/christinalake.html
Nearby cities:
Coordinates:   55°40'40"N   110°43'43"W
This article was last modified 12 years ago